Updated 16 October 2026 · Rules current as at 16 October 2026 · 17 min read · By Xircon Homes, registered builder CDB-U-60500

Thinking about a granny flat, but worried about council approval? Good news: most granny flats in Victoria don’t need a planning permit.

Some do, though. It comes down to three things: the size of your block, the overlays on your land, and what’s written on your title.

This guide explains each one in plain English. That way, you know where you stand before you spend a dollar.

Short AnswerUsually not. A granny flat (officially a small second dwelling) needs no planning permit if it’s up to 80 m², on a residential lot of 300 m² or more, with no overlay that says otherwise. Smaller lots, Green Wedge zones and bushfire or flood overlays usually need one. A building permit is always needed. Source: Planning Victoria, updated 15 October 2026.

Size Limit80 m² since 15 Oct 2026
Lot Size300 m² or more: usually no permit. Under 300 m²: permit needed
Building PermitAlways needed
Heritage or Character OverlayNo permit if 5 m tall or less, muted colours
Bushfire or Flood OverlayPlan for a permit
Covenant or Section 173Check your title first
In This Guide
  1. Do You Need a Planning Permit for a Granny Flat?
  2. Planning Permit vs Building Permit: What’s the Difference?
  3. When Your Zone Means You Need a Permit
  4. What Is an Overlay, and Which Ones Matter?
  5. Heritage, Character and Design Overlays: The 5 m Rule
  6. Bushfire, Flood, Landscape and Tree Overlays
  7. What Is a Restrictive Covenant?
  8. What Is a Section 173 Agreement?
  9. Covenant vs Section 173 vs Easement
  10. Live in a New Estate? Check the Estate Rules Too
  11. How to Check Your Land in 4 Steps
  12. What If You Do Need a Planning Permit?
  13. Planning Permit Myths, Busted
  14. How Xircon Checks Your Block
  15. Granny Flat Planning Permit FAQs
  16. Footnotes and Sources

Do You Need a Planning Permit for a Granny Flat?

Probably not. Most granny flats in Victoria need a building permit only.

Since 14 December 2023, a granny flat can skip the planning permit on most residential blocks. That’s the rule for what Victoria calls a small second dwelling.

And it just got bigger. Since 15 October 2026, the limit is 80 m², up from 60 m². Here’s what the 80 m² change means.

But “most” isn’t “all”. Answer the four questions below to see where your block sits.

Checklist infographic with four yes-or-no questions about lot size, zone, overlays and the title; four yes answers usually mean a granny flat in Victoria needs no planning permit.
Four yeses usually means no planning permit. Based on Planning Victoria’s applicant’s guide (October 2026).
No permitLot of 300 m² or more in a normal residential zone, with no overlays.
No permitHeritage, character or design overlay, if the granny flat is 5 m tall or less and in muted colours.
It dependsLandscape or environment overlay: a permit is needed to build, unless its schedule says otherwise. Also a rural zone with earthworks or setbacks.
Permit neededLot under 300 m², a Green Wedge or Rural Conservation zone, or a second granny flat on the same lot.
Plan for oneBushfire or flood overlay. Councils say these usually need a permit.

The title question works a little differently. A covenant or Section 173 agreement doesn’t always mean a permit, but it can still stop you building. We explain both further down.

Planning Permit vs Building Permit: What’s the Difference?

A planning permit is about where and what you build. A building permit is about how you build it safely.

Think of it like a school excursion. The planning permit is the permission slip: can you go? The building permit is the safety check: is the bus safe to drive?

Planning Permit Building Permit
What it checks Can this home go on this land? Is it built safely and to code?
Who gives it Your council A registered building surveyor
Needed for a granny flat? Sometimes Always
Typical wait About 10 days (VicSmart) to a few months Usually quicker
Important: “no planning permit” never means “no approval”. Every granny flat needs a building permit before work starts, and an occupancy permit or final inspection at the end.

When Your Zone Means You Need a Permit

Every block in Victoria has a zone. Your zone and your lot size decide the first part of the answer.

A zone is like a label on a map. It says what the land is mainly used for, such as houses, farms or bushland.

Here’s what Planning Victoria’s guide says for each zone:

Your Zone Planning Permit for a Granny Flat?
General Residential, Neighbourhood Residential, Residential Growth, Mixed Use or Township No, unless the lot is under 300 m²
Low Density Residential No
Rural Living, Farming or Rural Activity No, unless there are earthworks or it’s closer than the zone’s setback
Green Wedge, Green Wedge A or Rural Conservation Yes, always
Any other zone Check the planning scheme or ask council

Source: Planning Victoria Applicant’s Guide and small second homes page.

Friendly tip: the 300 m² is the whole lot, not your backyard. A 450 m² block with a big house on it still counts as 450 m².

Have a lot under 300 m²? You can still build a granny flat. You just apply for a planning permit first, and council checks it against the normal design rules (Clause 54).

What Is an Overlay, and Which Ones Matter?

An overlay is an extra rule placed over part of a map, like a sticker on top of your zone.

Your zone covers the basics. An overlay adds a special rule for one reason, such as protecting old houses, trees, or homes from bushfire and floods.

Some overlays barely affect a granny flat. Others almost always mean a permit.

Infographic sorting planning overlays for a granny flat in Victoria into green, amber and red: heritage, character and design overlays; environment, landscape and vegetation overlays; and bushfire and flood overlays.
Overlays at a glance. Green: usually no permit if you meet the rules. Amber: check the overlay’s schedule. Red: plan for a permit. The table below has the detail.
Overlay Short Name What It Means for a Granny Flat
Heritage Overlay HO No permit if 5 m tall or less and in muted colours
Neighbourhood Character Overlay NCO No permit if 5 m tall or less and in muted colours
Design and Development Overlay DDO No permit if 5 m tall or less and in muted colours, but its other rules still apply
Significant Landscape or Environmental Significance Overlay SLO, ESO Permit needed to build, unless the overlay’s schedule says it isn’t
Vegetation Protection Overlay VPO Only matters if protected trees or plants need to come out
Airport overlays AEO, MAEO Permit needed, and some don’t allow a second home
Bushfire Management Overlay BMO Councils say a permit is needed
Flood overlays LSIO, FO, SBO Expect a permit; councils treat flooding as a hazard

Sources: Planning Victoria, Clause 42.03 (landscape), Moorabool Shire and Yarra Ranges Council.

You’ll find your overlays, for free, in a planning property report. We show you how in the four steps below.

Not Sure What’s on Your Land?

At a free site inspection, we check your zone, overlays and title, and tell you if a planning permit is needed before you sign anything.

Book a Free Site InspectionCall 1800 947 266

Heritage, Character and Design Overlays: The 5 m Rule

In a heritage, character or design overlay, a granny flat usually needs no permit if it’s 5 m tall or less and finished in muted colours.

These overlays protect how a street looks. A low granny flat in soft colours, tucked behind the house, doesn’t change the street much. That’s why it gets a pass.

A low single-storey granny flat in soft grey and timber tones in the backyard of a restored Victorian weatherboard home in an older Melbourne suburb.
Artist’s impression. In a heritage area, a granny flat 5 m tall or less in muted colours usually needs no planning permit.

“Muted” means soft, quiet colours that blend in. Here are some examples of what that usually looks like:

Muted: usually fine

Greys, stone, olive and natural timber.

Bright: may need a permit

Strong reds, yellows, blues and pinks.

Colour examples are a guide only. Your council decides what counts as muted.

A few extra rules to know:

  • Heritage Overlay: changing or knocking down your existing house still needs a permit.
  • Heating, cooling and hot water: normal home services like these are exempt.
  • Solar panels: may need a permit in a heritage area if people can see them from a street, lane or park.
  • Design and Development Overlay: any rules in it that apply to every building still apply.
  • Neighbourhood Character Overlay: if you do need a permit, its local design rules apply.

Bushfire, Flood, Landscape and Tree Overlays

Bushfire, flood, landscape and environment overlays usually mean a planning permit. Tree rules only matter if plants need to come out.

These overlays are about safety and nature, not looks. So the 5 m rule doesn’t help here.

Bushfire (BMO)Councils such as Moorabool say a granny flat in a Bushfire Management Overlay needs a planning permit. Expect extra design rules for fire safety.
Flooding (LSIO, FO, SBO)Yarra Ranges Council says a permit is needed where there are bushfire, flooding or other hazards. Floor levels may need to sit higher.
Landscape and Environment (SLO, ESO)These need a permit to build, unless the overlay’s schedule says one isn’t needed. The granny flat exemption doesn’t cover them.
Protected Trees (VPO and Clause 52.37)Building is fine, but removing, cutting or lopping protected trees can need a permit, even without an overlay.
Friendly tip: a tree you want to keep can also decide where the granny flat goes. Check it early, before you fall in love with a spot.

What Is a Restrictive Covenant?

A restrictive covenant is a private rule between neighbours, written on your land’s title. It can stop a granny flat even when no permit is needed.

Picture a promise made years ago, when your street was first sold off. “Only one house per block.” “Brick walls only.” That promise stays with the land, and every new owner has to keep it.

Councils don’t make covenants, and they don’t police them. The neighbours who benefit from the covenant do, and they can go to the Supreme Court.

Illustrated example of a Victorian certificate of title with labels showing where to find covenants, Section 173 agreements and easements before building a granny flat.
Where to look on your title. Covenants and Section 173 agreements are listed under encumbrances; easements are shown on the title plan. Example only.

Quick Check: Could This Covenant Affect a Granny Flat?

“No more than one dwelling on the lot”

Very likely. A granny flat is a second dwelling. Ask a property lawyer to read the exact words.

“Walls must be brick or masonry”

Possibly. It may control your granny flat’s walls too. Check before you choose materials.

“No fence higher than 1.8 m”

Probably not. It limits fences, not homes. Just keep any new fence under the limit.

No covenant on the title at all

Nothing to worry about here. Move on to Section 173 agreements and easements.

Found a covenant that blocks you? There are two ways to change it:

  1. Apply to Council to Remove or Change It

    You apply for a planning permit. Neighbours who benefit get a letter, and a sign goes up on your land. Covenants made before 25 June 1991 are much harder to change.

  2. Apply to the Supreme Court

    Under Section 84 of the Property Law Act 1958. This is slower and usually costs more.

Important: council can’t approve a plan that breaks a registered covenant unless the covenant is changed first, or at the same time. Get advice from a property lawyer before you start. Planning Victoria’s restrictive covenants guide explains the process.

What Is a Section 173 Agreement?

A Section 173 agreement is a contract between your council and the landowner, recorded on the title. It can limit what you build.

It’s named after Section 173 of the Planning and Environment Act 1987. Unlike a covenant, council made it, and council enforces it. Breaking one is an offence.

It also sticks to the land. If you buy a home with a Section 173 agreement, you take it on too.

Councils use them for things like:

  • Building envelopes: the area of a lot where buildings can go.
  • Staged estates, where land is built in parts.
  • Protecting trees, vegetation or heritage.
  • Keeping the look and feel of a neighbourhood.

Many agreements say nothing about granny flats. Some set limits on where or what you build. The only way to know is to read yours.

Can you change one? Yes, if council and everyone bound by it agree. Some also end on their own after a set date or event. Planning Victoria’s agreements guide has the details.

Covenant vs Section 173 vs Easement

All three are on your title, but each works differently. Here’s the side-by-side.

Restrictive Covenant

Who made it
Past landowners
Who enforces it
Neighbours who benefit
Can it stop a granny flat?
Yes, if the wording rules it out
How to change it
Council permit or Supreme Court

Section 173 Agreement

Who made it
Council and a past or current owner
Who enforces it
Council
Can it stop a granny flat?
Sometimes, such as with a building envelope
How to change it
Agreement with council

Easement

Who made it
Usually set up when the land was subdivided
Who uses it
Water, power or drainage authorities
Can it stop a granny flat?
You usually can’t build over it
How to change it
Hard; design around it instead

An easement is a strip of your land that someone else is allowed to use, often for pipes or cables. It’s why a granny flat sometimes sits a little off-centre in the backyard.

Live in a New Estate? Check the Estate Rules Too

Newer estates often have their own design rules, on top of Victoria’s. You may need the developer’s approval before the building permit.

Many estates in growth suburbs, like Clyde North and Cranbourne, have design guidelines and a Memorandum of Common Provisions (MCP). It’s a rule book for every lot in the estate.

These rules often cover building envelopes, setbacks, fences and driveways.

Some estates also want their design panel to approve new buildings for a few years after the land was first sold. One Clyde estate we checked asks for this for 8 years.

Friendly tip: look at your contract of sale. The MCP and any Section 173 agreement are usually attached.

Live in the City of Casey? Casey says a granny flat may not need a planning permit if it meets the rules and no overlays apply.

Want it in writing? Send Casey a planning enquiry. For local rules and designs, see our guide to granny flats in Clyde North.

How to Check Your Land in 4 Steps

You can check most of this yourself, mostly for free, before you talk to a builder.

Infographic showing four steps to check your land for a granny flat in Victoria: get a planning property report, read your title, ask your council, then book a site inspection.
Four steps to check your land, most of them free.
  1. Get a Free Planning Property Report

    Type your address into Planning Victoria’s property report. It shows your zone and every overlay. Write them down.

  2. Read Your Certificate of Title

    Look for covenants, Section 173 agreements and easements. No copy? Buy a title search from Landata.

  3. Ask Your Council

    Find your council with Know Your Council. Ask if your plan needs a planning permit, in writing if you can.

  4. Book a Free Site Inspection

    We put it all together: zone, overlays, title, estate rules and where a granny flat fits.

A couple at a kitchen table checking printed house plans and a colour-coded zoning map on a laptop, with their backyard visible through the glass sliding door.
Artist’s impression. Your certificate of title and a free planning property report answer most permit questions.

What If You Do Need a Planning Permit?

Needing a permit doesn’t mean no. It means more paperwork and more time.

Here’s what usually happens:

  • Fast track: some simple applications go through VicSmart, which takes about 10 days. Ask council if yours qualifies.
  • Normal track: council checks your plans against the design rules and may tell neighbours. This takes longer, often a few months.
  • Then the building permit: once planning is approved, the building surveyor issues the building permit.

Planning permit fees and any lawyer’s costs are extra to the build price. Our granny flat cost guide shows what’s included and what isn’t.

Want the full approval journey, step by step? Read how a granny flat gets approved in Victoria.

Planning Permit Myths, Busted

Tap each myth to see the facts, based on the rules as at October 2026.

MythEvery granny flat needs council approval.

Fact: most need only a building permit from a building surveyor.

MythNo planning permit means you can’t be stopped.

Fact: a covenant or Section 173 agreement on your title can still stop you.

MythA heritage area means no granny flat.

Fact: one 5 m tall or less, in muted colours, usually needs no permit.

MythCouncil enforces covenants.

Fact: neighbours who benefit enforce them, not council.

MythThe 300 m² means backyard size.

Fact: it’s the whole lot, house and all.

MythA small lot means it’s impossible.

Fact: under 300 m², you can still apply for a planning permit.

How Xircon Checks Your Block

We check the rules before you sign, so a permit never comes as a surprise.

  1. Zone and OverlaysWe pull your planning property report and tell you if a planning permit is needed.
  2. Your Title and Estate RulesWe read your covenants, Section 173 agreement, easements and MCP before you commit.
  3. The Building Permit Is IncludedWorking drawings, engineering, soil test, survey, 7-star energy report and the building permit are all in the price.
  4. One Fixed PriceOur 11 designs are 40–60 m², from $154,990*, built on site by a registered builder (CDB-U-60500). Our Xircon guarantees apply, subject to published terms and eligibility.

Ready to compare designs? Browse our granny flats in Melbourne, or start with the 40 m² Lorne for smaller backyards.

Find Out If Your Block Needs a Permit

A Sales Consultant visits, checks your zone, overlays and title, and gives you a fixed-price quote in writing. Free, with no obligation to build.

Book a Free Site InspectionCall 1800 947 266

We use your details only to respond to your enquiry. See our privacy policy.

Granny Flat Planning Permit FAQs

Do I Need a Planning Permit for a Granny Flat in Victoria?

Usually not. A granny flat of up to 80 m² on a residential lot of 300 m² or more, with no overlay that requires one, needs only a building permit. You need a planning permit on lots under 300 m², in Green Wedge and Rural Conservation zones, and under some overlays such as bushfire and flood.

Do I Need Council Approval for a Granny Flat?

Not always. Most granny flats don’t need a planning permit from council. Every granny flat needs a building permit, which comes from a registered building surveyor, not council. Council approval is needed when your lot, zone or overlays trigger a planning permit.

Can I Build a Granny Flat on a Lot Under 300 m²?

Yes, with a planning permit. On lots under 300 m² in the main residential zones, council assesses the granny flat against the normal design rules in Clause 54 before you can get a building permit.

Do I Need a Planning Permit for a Granny Flat in a Heritage Overlay?

Usually not, if the granny flat is 5 m tall or less and finished in muted colours. The same applies in a Neighbourhood Character Overlay and a Design and Development Overlay. Changing or demolishing your existing house in a Heritage Overlay still needs a permit.

Do I Need a Planning Permit in a Bushfire Management Overlay?

Expect one. Councils such as Moorabool say a small second dwelling in a Bushfire Management Overlay needs a planning permit, and the design must meet bushfire safety requirements.

Can a Restrictive Covenant Stop a Granny Flat?

Yes. A covenant such as one dwelling per lot can stop a granny flat even when no planning permit is needed. Covenants are private agreements enforced by the neighbours who benefit, not council. Ask a property lawyer to read the wording.

How Do I Remove a Restrictive Covenant in Victoria?

You can apply to council for a planning permit to remove or vary it, or apply to the Supreme Court under Section 84 of the Property Law Act 1958. Benefiting owners are notified, and covenants made before 25 June 1991 are much harder to change.

What Is a Section 173 Agreement?

It’s a legal agreement between council and a landowner under Section 173 of the Planning and Environment Act 1987. It’s recorded on the title, binds future owners, and can limit how land is used or developed, such as with a building envelope.

Can a Section 173 Agreement Stop a Granny Flat?

Sometimes. Many agreements say nothing about granny flats, but some limit where or what you can build. Read your agreement, and if it blocks your plans, it can be changed or ended with council and everyone bound by it agreeing.

Can I Build a Granny Flat Over an Easement?

Usually not. Easements let authorities use part of your land for pipes, cables or drainage, so building over them is normally not allowed. Your easements are shown on your certificate of title.

How Do I Find the Overlays on My Property?

Get a free planning property report from Planning Victoria’s website by typing in your address. It lists your zone and every overlay that applies. Your council can also confirm them.

How Long Does a Planning Permit Take for a Granny Flat?

Simple applications through VicSmart take about 10 days. Standard applications take longer, often a few months, especially if neighbours are notified. Ask your council which process applies.

Do I Need a Planning Permit for a Granny Flat in Casey?

Often not. The City of Casey says a small second dwelling may not need a planning permit if it meets the definition and no overlays apply. Lots under 300 m² need one. You can ask Casey for written confirmation through a planning enquiry.

Can I Build a Granny Flat in a New Estate?

In most cases, yes. Newer estates often have design guidelines, an MCP or a Section 173 agreement, and some need the developer’s design approval for a number of years. Check your contract of sale before you start.

How We Checked This Guide

Every rule in this guide comes from the Department of Transport and Planning (Planning Victoria), the Building and Plumbing Commission and council websites, checked on 16 October 2026. Planning Victoria updated its small second homes page on 15 October 2026 for Amendment VC306, which raised the limit to 80 m², and this guide reflects that change. The guide was written by the Xircon Homes team and reviewed before publishing. It is general information, not legal advice. We review it every three months, or sooner when the rules change.

Footnotes and Sources

*Prices from $154,990 (40 m², one bedroom) to $184,900 (60 m², three bedrooms), on a standard, level site with easy access, as at October 2026. Excludes site costs beyond our allowances, council, planning and authority fees, legal costs, variations, landscaping, fencing, driveways and furniture. Subject to terms and conditions; a site-specific fixed-price quote is provided after a free site inspection. Guarantees are subject to published terms and eligibility. This guide is general information about Victoria’s rules as at October 2026, not planning or legal advice. Rules can change; check with your council, a building surveyor or a property lawyer. Images are artist’s impressions. Xircon Homes, 3C/36 Hume Road, Laverton North VIC 3026. Registered Domestic Builder CDB-U-60500.

Sources, all checked on 16 October 2026