When Is a Building Permit Required in Melbourne?

Important disclaimer: This article is for general information purposes only. It is not legal, planning, financial, or building advice. Building permit rules, exemptions, thresholds, and fees change over time and can differ by council, project, and site. Xircon Homes accepts no responsibility or liability for any loss, damage, cost, delay, penalty, or outcome arising from any use of, or reliance on, the information in this article. Always confirm your project’s specific requirements with a Registered Building Surveyor, your local council, and the Building and Plumbing Commission before starting any building work.

 

When Is a Building Permit Required in Melbourne?

In Victoria, you need a building permit for almost all building work before it starts. The rule comes from the Building Act 1993 and the Building Regulations 2018. A small group of minor jobs is exempt under Schedule 3 of the Regulations. 

That covers some sheds under 10 square metres, some pergolas, and minor repair work. If you plan to build a new home, extend, demolish, or knock down and rebuild in Melbourne, you will need a building permit.

What Is a Building Permit?

A building permit is a written approval from a Registered Building Surveyor. It confirms your plans meet the Building Act 1993, the Building Regulations 2018, and the National Construction Code. The permit lets work start. It also sets out the checks that must happen at key stages.

Building permits protect you. They confirm the people on your job are registered and insured. They confirm your plans meet the code. They also make sure a surveyor checks the work at each stage. And they confirm the finished home is safe to live in.

A building permit is not the same as a planning permit. People often mix the two up. We explain the split below.

When You Need a Building Permit in Victoria?

The rule is simple. In Victoria, all building work needs a building permit. The only jobs that skip this rule are the ones Schedule 3 of the Regulations lists as exempt. In practice, most home projects need a permit before work can start.

You will need a building permit for:

  • New homes, including knockdown rebuilds and custom homes
  • Extensions and add-ons to your home
  • Structural work
  • Demolition of a home
  • Pools and spas, plus their safety fences
  • Retaining walls over one metre, or where linked to other building work
  • Decks, verandahs, and carports above the exempt size and height limits
  • Re-blocking or re-stumping
  • A change of use, or a change in occupancy class

If your project is not on the exempt list, treat it as a permit job. Then check with a Registered Building Surveyor before you spend money.

Planning a new build or knockdown rebuild in Melbourne? Talk to Xircon Homes about a free site appraisal. We handle every building permit and approval for you as part of our fixed-price contract. Speak to our team — serving Melbourne since 2013.

Building Permit vs Planning Permit: The Key Difference 

A planning permit gives you the right to use or develop land in a set way. A building permit confirms the build meets safety, structural, and code rules. They are two separate approvals. Different bodies issue them. Different laws set the rules.

Where you need both, the planning permit comes first. A Registered Building Surveyor cannot issue a building permit until the planning permit is in place. The building permit must also match what the planning permit sets out.

Planning Permit vs Building Permit at a Glance

Feature Planning Permit Building Permit
Law Planning and Environment Act 1987 Building Act 1993
Issued by Local council (Responsible Authority) Registered Building Surveyor (private or council)
Purpose Permission to use or develop land Confirms the build meets code
Focus Land use, siting, character, overlays Structure, fire, energy, plumbing, checks
Needed for every build? No — depends on zone and overlays Yes — unless Schedule 3 lists it as exempt
Order Must come first if needed Cannot be issued until any planning permit is in place

Whether you need a planning permit depends on your zone, any overlays, and whether your design meets ResCode. Overlays include heritage, vegetation, and bushfire zones. Amendment VC282 also updated ResCode setback and shadow rules from September 2025.

You can check the zone and overlays for any Victorian property. Use the free VicPlan tool at planning.vic.gov.au.

Planning a rebuild? Read our knock down rebuild Melbourne complete process guide.

Building Work That Always Needs a Permit 

Building Work That Always Needs a Permit

The jobs below always need a building permit in Victoria. Size and value do not change this.

  • A new house or dwelling
  • A granny flat (small second dwelling), even when no planning permit is needed (see our granny flat rules in Victoria)
  • A knockdown and rebuild
  • Townhouses, dual occupancies, and multi-dwelling builds
  • Extensions that add floor area or height
  • Structural work, such as removing or changing load-bearing walls
  • Underpinning or replacing footings
  • Demolition of a home
  • Fixed pools and spas, plus their safety fences
  • Re-blocking or re-stumping
  • Class 10a buildings (garages, carports, sheds) over 10 square metres

For any of these jobs, work cannot start until the building permit is issued. Where a planning permit is also needed, it must come first.

Building Work That May Be Exempt from Building Permit

Schedule 3 of the Building Regulations 2018 sets out the building work that does not need a building permit. The most common home exemptions include:

  • A freestanding Class 10a building (garage, carport, or shed) up to 10 square metres, subject to setback and height limits
  • Some pergolas linked to houses, where they meet size and siting limits
  • Retaining walls under one metre, if not linked to other building work
  • Some fences, subject to height and location rules
  • Repair or maintenance of part of a home, where the work does not change the structure, floor area, height, or any load-bearing element
  • Some temporary structures, such as some real estate signs

There is a catch. Even where you do not need a permit, the work must still meet the National Construction Code. It must not affect any building it attaches to. Some exempt work may also still need a planning permit. The two exempt lists are not the same.

If your job may fall in one of the groups above, read Schedule 3 in full on the Victorian Legislation website. Or ask a Registered Building Surveyor to confirm. Getting this wrong can lead to unlawful work and fix-up orders down the track.

Who Issues Building Permits in Victoria? 

A Registered Building Surveyor issues your building permit. You can use a private surveyor, or a council surveyor at your local council. Private surveyors usually work faster than council teams.

Since 1 July 2025, the Building and Plumbing Commission (BPC) has been in charge of building surveyors. It replaced the Victorian Building Authority (VBA). The BPC now looks after builder and surveyor sign-up, insurance, and conduct across Victoria.

You can check any surveyor or builder through the BPC’s Find a Practitioner tool. Do this before you appoint anyone. It takes less than a minute.

Building a custom home in Melbourne? Xircon Homes handles every approval for you. That covers planning permit help, building permit lodgement, and all the checks. Learn more about our custom home builders Melbourne service.

What Happens If You Build Without a Permit? 

Building without a required permit is an offence. The rule sits in Sections 16 and 16B of the Building Act 1993. Fines can apply to owners, builders, and anyone else on the job.

The fallout goes beyond fines. Unlawful building work can lead to:

  • A building notice or a building order from your council surveyor telling you to stop
  • A fix-up order that may force you to change the work, or in some cases, tear it down
  • Trouble when you sell the home, because buyers and lawyers spot unpermitted work during the sale
  • Insurance problems, both for damage claims and for Domestic Building Insurance
  • Problems at handover, because a surveyor cannot issue an occupancy permit for work that was never permitted

The BPC also has powers that reach a builder after an occupancy permit has been issued. Skipping the permit is not a shortcut worth taking. It is one of the top causes of homeowner disputes we see.

Building Permits for New Homes and Knockdown Rebuilds 

Building Permits for New Homes and Knockdown Rebuilds 

Any new home, extension, or knockdown rebuild in Melbourne needs a building permit. No size limit lets a home skip this rule. A single-storey four-bedroom home in Tarneit needs one. So does a double-storey custom home in Kew.

A knockdown rebuild is more layered. You deal with two building permits, and often a planning permit too:

  1. Section 29A demolition consent under the Building Act 1993, before you can legally demolish
  2. A demolition building permit, issued by a Registered Building Surveyor
  3. A planning permit from your council, if triggered by an overlay, a ResCode change, or a zone rule
  4. A building permit for the new home, which cannot be issued until any planning permit is in place

You will also usually need an asset protection permit from your council before demolition starts. This covers any damage to council assets, such as footpaths, nature strips, and kerbs, during the build.

The order matters. Getting it wrong can add weeks or months to your project. This is one reason to use a builder who runs the full approvals workflow for you.

For more on the KDR process end to end, read our knockdown and rebuild questions Melbourne homeowners ask guide. For timing on demolition, see how long does it take to knock down a building in Melbourne.

Ready to knock down and rebuild? Xircon Homes handles every demolition, planning where needed, and the building permit — under one fixed-price contract. Learn more about our knockdown and rebuild specialists in Melbourne service. HIA Award winners three years running: 2022, 2023, and 2024.

Owner-Builder Permits and the Certificate of Consent 

Some people want to run their own build. If you plan to do that on your own land, and the work is over $16,000, you need a Certificate of Consent from the BPC. You must have it before a building permit can be issued.

This rule covers Victorian home building work above the $16,000 threshold. It applies to land you own, where you plan to live for at least six months after the build finishes.

Owner-building also comes with other duties:

  • A written major domestic building contract for any work over $10,000 with a builder or tradesperson, under the Domestic Building Contracts Act 1995
  • Domestic Building Insurance from any registered practitioner you hire for work over $16,000
  • A defects inspection report if you sell your owner-built home within six and a half years of the build, plus Domestic Building Insurance on the work

You can read the full owner-builder path on the Consumer Affairs Victoria page for owner builders.

For most first home buyers and families, hiring a registered builder is the simpler, lower-risk path. It also means the builder carries the permit duties, not you.

How to Apply for a Building Permit in Melbourne 

The application runs through a Registered Building Surveyor. The typical steps look like this:

  1. Appoint a Registered Building Surveyor. You cannot apply without one. Your surveyor checks your plans and issues the permit.
  2. Prepare your plans. At a minimum, you need drawings, engineering plans, a NatHERS energy report, a soil report, and specs. Weak plans are the top cause of permit delays.
  3. Confirm planning approval. If your job needs a planning permit, get that from your council first.
  4. Submit the application. Your surveyor lodges the plans, specs, and forms.
  5. Pay the building permit levy. The levy goes to the BPC before a permit number is issued.
  6. Building permit issued. Once your surveyor is happy that the plans comply and any other approvals are in place, the permit is issued. It also lists the checks needed during the build.

Permit timeframes vary. A simple permit through a private surveyor can be issued in a few weeks once your plans are complete. Complex jobs, or jobs that also need a planning permit, can take much longer.

Prefer a turnkey option? Xircon Homes’ house and land packages come with fixed site costs and a set site start date. Available across Melbourne’s growth corridors.

Building Permit Costs and the Levy 

A building permit in Victoria has two main costs. There is a fee from your Registered Building Surveyor. And there is the building permit levy paid to the BPC.

The levy is based on the cost of the building work. The BPC lists a current levy calculator on its website. You must pay the levy before the building permit number is issued.

Other project fees may also apply, such as:

  • A planning permit fee, where a planning permit is needed, paid to your council
  • An asset protection permit, paid to your council for KDR and larger jobs
  • Report and consent fees, where you need council consent for a setback, siting, or other change

Total permit costs vary widely. They depend on project scope, project value, surveyor rates, and any extra consents you need. For a fixed-price KDR or custom home with Xircon Homes, all standard permit and levy costs are in your contract.

Fees are indicative and subject to change. Always confirm current levy rates via the Building and Plumbing Commission Building Permit Levy Calculator and quoted fees with your Registered Building Surveyor and council.

Frequently Asked Questions 

Do I need a building permit for a new home in Melbourne?

Yes. All new home building in Victoria needs a building permit. A Registered Building Surveyor issues it before work can start. This rule covers single-storey homes, double-storey homes, custom builds, knockdown rebuilds, and house and land packages. If your site also needs a planning permit, that must come first. See the Building and Plumbing Commission page on when a building permit is required.

Do I need a building permit for a renovation?

It depends on the scope. Structural work, extensions, changes to floor area or height, and load-bearing wall changes all need a building permit. Cosmetic work — repainting, new cabinets, non-structural fixture swaps — is usually exempt under the repair and maintenance rules in Schedule 3 of the Building Regulations 2018. Confirm with a Registered Building Surveyor before you start.

Do I need a building permit for a deck or pergola?

Some pergolas linked to houses are exempt under Schedule 3. Exemptions come with size, siting, and build limits. Decks are subject to size, height, and structure limits. The rules are specific. Check with a surveyor or your council before you rely on any exemption. The BPC practice note BP 01 sets out the detail.

Do I need a building permit for a shed in Victoria?

A freestanding Class 10a building — such as a private garage, carport, or shed — up to 10 square metres may be exempt. It must meet the setback and height limits in Schedule 3. Sheds over 10 square metres need a building permit. Some councils also apply planning rules to sheds, so you may still need a planning permit. See the BPC page on when a building permit is required.

How long does a building permit take to get in Victoria?

Timeframes vary. A simple permit through a private surveyor can be issued in a few weeks of complete plans being lodged. Complex jobs, or ones that need a planning permit first, take much longer. Incomplete plans are the top cause of delay. The Planning Victoria guide to planning permits covers the planning side.

What is the difference between a building permit and a planning permit?

A planning permit comes from your council under the Planning and Environment Act 1987. It gives you the right to use or develop land. A building permit comes from a Registered Building Surveyor under the Building Act 1993. It confirms the build meets code and rules. Where you need both, the planning permit must come first.

Who is responsible for getting the building permit — me or the builder?

For most homeowners with a registered builder, the builder or the builder’s surveyor handles the permit for you. For owner-builders on work over $16,000, you must get a Certificate of Consent from the BPC first. You then carry the permit duties yourself. See Consumer Affairs Victoria’s owner-builder checklist.

What happens if I build without a permit in Victoria?

Building without a permit is an offence under Sections 16 and 16B of the Building Act 1993. The fallout can include fines, building orders, fix-up orders that may force a demolition, trouble when you sell, insurance issues, and no occupancy permit at handover.

Who is the Building and Plumbing Commission?

The Building and Plumbing Commission (BPC) is Victoria’s building industry regulator. It started on 1 July 2025. It replaced the Victorian Building Authority (VBA), Domestic Building Dispute Resolution Victoria, and the domestic building insurance arm of the Victorian Managed Insurance Authority. The BPC now oversees builder and surveyor sign-up, the building permit levy, owner-builder consents, and enforcement.

Do I need domestic building insurance to get a building permit?

Domestic Building Insurance is a must for home building work over $16,000. Your builder must provide it before asking for or receiving any payment under a major domestic building contract. It is a separate rule from the building permit itself. But it is a standard part of any registered builder’s compliance package. See the BPC page on Domestic Building Insurance for builders.

Ready to Build in Melbourne? Let Xircon Homes Handle the Process

Melbourne’s building permit process is well set out. But the order between planning permits, building permits, demolition consents, and asset protection permits is where most homeowners get caught out. Missing one approval, or getting them out of order, can add weeks to a build and cost you thousands.

Xircon Homes has built custom homes, knockdown rebuilds, and house and land packages across Melbourne since 2013. We are HIA Award winners in 2022, 2023, and 2024. Every project comes with fixed site costs, a 30-year structural guarantee, and full management of every permit your build needs.

Whether you are looking at a knockdown and rebuild in Melbourne, a custom home build on your own block, or a fixed-price house and land package in one of Melbourne’s growth corridors, we take responsibility for your home building.

Book a free site appraisal with our team and get clear, written answers on what your project needs — before you commit a dollar.

Sources and Further Reading 

All information in this article is drawn from Victorian government sources. Confirm current rules directly before making building decisions.

Legislation

Disclaimer

This article is published by Xircon Homes for general information purposes only. It is not legal, planning, financial, or building advice, and it must not be relied on as a substitute for professional advice on your specific project.

Building permit rules, exemptions, cost thresholds, and fees in Victoria sit under the Building Act 1993 (Vic), the Building Regulations 2018 (Vic), the Planning and Environment Act 1987 (Vic), the Domestic Building Contracts Act 1995 (Vic), and related laws and regulations. These laws and any related guidance from the Building and Plumbing Commission, Consumer Affairs Victoria, local councils, and other authorities are subject to change without notice. Cost figures, timeframes, and process descriptions are indicative only and can vary by project, council, site conditions, and market conditions.

Xircon Homes accepts no responsibility or liability for any loss, damage, cost, delay, penalty, fine, dispute, or other outcome arising from any use of, or reliance on, any part of the information in this article, whether by act or omission. To the maximum extent permitted by law, Xircon Homes excludes all warranties (express or implied) as to the accuracy, completeness, currency, or suitability of the information for any particular purpose.

Before starting any building work, you must confirm your project’s specific requirements with a Registered Building Surveyor, your local council, the Building and Plumbing Commission, and any other relevant authority. External links in this article are provided as a convenience only. Xircon Homes does not control and is not responsible for the content of any third-party or government website.