Who Pays Utilities During the Build Process? | Melbourne Guide

In most cases, the property owner pays for utilities during the build process,  not the builder. Connection and usage costs for electricity, water, gas, telephone/NBN and sewerage are commonly the owner’s responsibility.

Although the exact split depends on the special conditions in your specific building contract, some builders absorb certain costs, like electricity usage, until handover. The only way to know for certain is to check your contract.

This matters more than it first appears. Utility responsibility during a build is one of the most common sources of confusion, and unexpected bills for Melbourne homeowners partway through a new home or knockdown rebuild project. 

Different builders structure this differently, which is exactly why it’s worth knowing where you stand before you commit to a contract.

 

How Utility Responsibility Is Set Out in a Building Contract

Utility responsibility during construction is set out in the special conditions of a building contract, most commonly a Housing Industry Association (HIA) Victorian New Homes Contract, which is one of the standard form building contracts recognised by Victoria’s Building and Plumbing Commission.

Victoria’s Domestic Building Contracts Act 1995 requires that a domestic building contract clearly identifies the scope of work and the costs the owner is responsible for. It includes site work such as the provision of utilities. It doesn’t dictate which party pays for what,  that allocation is negotiated and documented contract by contract.

This is why two homeowners building with two different Melbourne builders can get completely different answers to “who pays the utilities during the build.” 

Some contracts have the builder absorb electricity usage and pass the account to the owner only at handover. Others place connection and usage costs for every utility on the owner from day one. Neither is more “standard” than the other, the only thing that matters is what’s written into your specific special conditions.

Who Pays for Electricity When Building a House?

Electricity is the utility most builders arrange directly, because power tools, site lighting, and trade equipment need it from the earliest stages of construction. A temporary builder’s supply, sometimes run from a builder’s pole and later replaced by the permanent meter box in its final position, is standard practice on Melbourne construction sites.

Who pays for the usage itself varies by contract. Some builders absorb electricity usage costs and transfer the account to the owner only at handover. Others place connection and usage responsibility with the owner from the outset. 

Both arrangements are common, confirm which applies to your contract before signing, and ask specifically whether the account is in the builder’s name or yours during construction.

Who Pays for the Water Bill During Construction?

Water usage during construction for concreting, brickwork, cleaning, and general site needs is commonly charged to the owner, even in contracts where the builder arranges the temporary standpipe connection itself.

This distinction between arranging a utility and paying for its usage is one of the most misunderstood parts of a building contract. A builder can install and manage a temporary water connection as part of their site management obligations while the usage costs still flow through to the owner under the contract’s special conditions.

Who Pays for Gas and Electricity During the Build?

Gas is generally the least active utility during construction, since it’s rarely needed until fixtures like cooktops, heating, or hot water systems are installed near the end of the build. Because of this, gas connection and any usage costs incurred during construction are commonly treated as the owner’s responsibility, separately from the electricity arrangement described above.

How Xircon Homes Handles Utilities During Your Build

How Xircon Homes Handles Utilities During Your Build

At Xircon Homes, utility responsibility is set out clearly as a standard part of the building contract. Generally, the owner is responsible for ensuring power and water connection is available at the site before construction starts, and for the connection and usage accounts across electricity, water, gas, telephone/NBN and sewerage. 

This can vary depending on the specific conditions of your site and project, but it’s a special condition typically included in Xircon’s contracts, so clients know what to expect rather than finding out partway through the build.

As a practical convenience, Xircon installs a conduit alongside the electricity trench during construction, giving telephone/NBN cabling a clear path ready for connection later, rather than requiring separate trenching after handover.

 

Utility Connection Responsibility Usage / Account During Construction
Electricity Owner usually ensures connection is available pre-commencement Owner (generally)
Water Owner usually ensures connection is available pre-commencement Owner (generally)
Gas Owner (generally) Owner (generally)
Telephone / NBN Owner (generally); Xircon installs the conduit alongside the power trench Owner (generally)
Sewerage / Drainage — Owner (service charges, generally)

 

Disclaimer: This reflects Xircon Homes’ typical building contract terms. Exact terms can vary depending on the specific conditions of your site and project, so always confirm the wording in your own signed contract.

If your new home includes gas appliances, it’s worth asking your Xircon consultant when the gas connection is scheduled relative to your build timeline. 

This is a good conversation to have alongside reviewing your house and land package or custom build inclusions, since it affects when you’ll need accounts set up with your chosen providers.

What Happens If Utilities Aren’t Connected When Construction Starts?

Delays with utility providers are common, particularly for electricity connections on blocks with limited existing infrastructure or in newer estates still being serviced. 

Under Xircon’s contract, the owner is generally responsible for ensuring power and water connection is available at the site before construction begins. If power isn’t connected in time, Xircon typically arranges generator hire so work can proceed without delay, with the cost of that hire usually charged to the owner as a variation.

This is one of several reasons it pays to start the electricity connection process — particularly underground power installation on a knockdown rebuild site — as early as possible, ideally as soon as your site is confirmed rather than waiting until closer to your scheduled commencement date.

If you’re demolishing an existing home as part of a knockdown rebuild in Melbourne, be aware this utility question actually starts before construction even begins: existing services need to be formally disconnected ahead of demolition, which is a separate process to the temporary connections used during the build itself..

Building with Xircon Homes means a guaranteed site start date in writing. That protects you from the kind of scheduling uncertainty that turns a simple utility connection delay into a costly generator hire bill. Talk to our team about your block before your tender appointment.

How to Avoid Utility Bill Surprises During Your Build

A few practical steps help you plan ahead rather than being caught out mid-build:

  • Request the exact wording of the utility special conditions in your contract before signing — don’t rely on a verbal summary from a sales consultant. Consumer Affairs Victoria’s building contracts checklist is a useful independent reference for what should be documented before you sign.
  • Set up your utility accounts early. Where connection and usage sit with you throughout construction, get in touch with your preferred electricity, gas and water providers as soon as your site is confirmed, rather than waiting for your build to start.
  • Budget for utility usage as part of your overall build costs, not as an afterthought — electricity, water and gas usage during construction is a real cost worth planning for alongside your contract price.
  • Start your electricity connection application early, especially for knockdown rebuild blocks converting from overhead to underground power, since this can take up to three months from application to live connection.

Every Xircon Homes build comes with fixed site costs and a 30-year structural warranty, so the items that are genuinely locked in are documented from the start. Explore our custom home building service if you are considering building a custom home with Xircon Homes.

Utilities During the Build: Frequently Asked Questions

Who pays for electricity when building a house? 

It depends on your contract, some builders absorb electricity usage costs until handover, while others place them with the owner from the start. Generally with Xircon Homes, the owner is responsible for both connection and usage, and for ensuring the connection is available before building work begins.

Who pays for gas and electricity during the build? 

Gas connection and usage is commonly the owner’s responsibility across the industry, since gas is rarely used until late in the build. At Xircon Homes, both gas and electricity — connection and usage — are generally the owner’s responsibility, along with telephone/NBN.

Who pays the water bill during construction? 

Water usage during construction is commonly charged to the owner, even where the builder arranges the temporary connection. At Xircon Homes, water connection and usage, along with drainage and sewerage service charges, are generally the owner’s responsibility.

Are utility costs included in a fixed price building contract? 

Fixed site costs typically cover defined site preparation items, not ongoing utility connection and usage. At Xircon Homes, utility costs generally sit outside the fixed price and are the owner’s responsibility, as is usually stated in the contract.

What happens if utilities aren’t connected before construction starts? 

Most builders arrange generator hire so work can continue if power isn’t connected in time, with the cost typically charged to the owner. At Xircon Homes, the owner is generally responsible for ensuring the connection is available before commencement, and generator hire costs are usually charged as a variation if it isn’t.

Does a knockdown rebuild have different utility requirements to a new home build? Y

  1. A knockdown rebuild requires existing gas, electricity, water and stormwater services to be formally disconnected and capped before demolition can begin — a separate process to the temporary connections used once construction is underway. Contact us now for a detailed breakdown. 

This article provides general information about common practice under Victorian domestic building contracts, alongside Xircon Homes’ typical contract terms, and does not constitute legal or financial advice. Utility responsibility varies by builder and by project — always confirm the exact terms with your builder before signing. Xircon Homes has been building new homes across Melbourne since 2013, backed by three consecutive HIA Award wins and a 30-year structural warranty on every home.

Ready to build with a Melbourne team that puts everything in writing? Get in touch with Xircon Homes to talk through your block and see exactly what’s included before you sign.