How Xircon Homes Build Your New Home
New Home Building Process Melbourne
At Xircon Homes, we believe building your new home should be transparent from day one. That’s why we’ve mapped out every stage, from your first design appointment through to your 12-month maintenance check, so you always know what’s happening.
- Knock Down & Rebuild Specialists
- 30-Year Structural Guarantee
- List Item Extended 12-Month Maintenance Period#3
01
Step 1 · Pre-Construction
New Home Selection
This is where your journey begins. Your new home consultant will walk you through our floor plans, inclusions, and siting options. We’ll also start exploring facade and styling choices suited to your block and your taste.
Xircon Action
- Your consultant will walk you through designs, standard inclusions, and complete a preliminary siting and quote.
- We'll request your property information and arrange a soil test survey.
- An appointment will be scheduled to work through floor plan variations and options.
- Our finance partners will contact you for a verbal finance assessment before your first deposit is required.
Your Action
- Provide a legible copy of your land contract, title, and plan of subdivision.
- If applicable, share any information about a pool, dimensions and position.
- Share your construction funding details with your consultant. We can connect you with our finance partners for funding advice.
- An initial deposit of $2,000 to secure the base price of house, site start allocation and promotional offer (if applicable). Please note this deposit is non-refundable.
02
Step 2 · Pre-Construction
New Home Confirmation
Exciting times ahead! It’s time to confirm and start making those key appointments.
Xircon Action
- Our new home consultant will submit your file to our Operations Team for review
- Your dedicated client liaison officer will welcome you with an introductory call and arrange your tender appointment approximately three weeks following the call.
Your Action
- Confirm your appointments and make any further arrangements needed on your end.
03
Step 3 · Pre-Construction
Tender
At this step, we’ll formulate your tender to build according to your sales quote and colour selection scheme. Site works pricing will be provided once soil testing and site surveys are completed.
Xircon Action
- House design and sitting (including site works) will be confirmed in a tender document. The tender will be based on your sales quote, soil test, site survey and preliminary engineering.
- Send you a standard Housing Industry Association (HIA) contract for you to review
- Give you an indicative spend range for your interior options based on your house type.
- Changes agreed upon on the day can be actioned where possible.
Your Action
- Attend your tender appointment and finalise any alterations. Allow a few hours for this meeting.
- Finalise all structural options for your new home.
- Sign the HIA fixed price tender and pay 3% of the tender price.
- Confirm your lending institution and provide pre-approval. If you're using our finance partners, this step is not required.
- Provide proof of land ownership if already settled, or an updated subdivision progress date if not yet settled.
04
Step 4 · Pre-Construction
Interior Design and Selections
It’s time to get creative! This is where you start to bring your dream home vision to life. Here you can decide on the interior and exterior styling of your new Xircon home.
Xircon Action
- Our expert colour consultant will help you finalise your selection of your interior and exterior looks. An appointment will be made to walk you through a range of materials, colours and textures to help you achieve your own distinctive style. We also offer samples so you can see and touch your final finishes.
- A follow up contract appointment will also be booked.
Your Action
- Attend your appointment with our colour consultant.
- Finalise all non-structural options for your new home.
05
Step 5 · Pre-Construction
Contract
Let’s bring your home to life! Your building contract and working drawings are complete and ready for you to sign before we break ground on your new home.
Please note — no further changes or variations are permitted after this stage. Review your selections carefully at Step 4 before you reach this point.
Xircon Action
- Provide a fixed price HIA Construction Contract based on your confirmed design, siting, and selections.
Your Action
- Attend the HIA building contract presentation with a full set of working drawings.
- Provide proof of land ownership and funding details for your financial institution if not already supplied.
- Sign your HIA fixed price contract.
- Pay the balance of your 5% deposit.
06
Step 6 · Pre-Construction
Post Contract Signing
Now that you have completed signing your contract, there are a few more steps to go before we start on site.
Xircon Action
- Submit plans for a Building Permit and obtain all required regulatory approvals — including Build Over Easement, Protection Work Notices, and Dispensations where applicable.
- Obtain Developer Approval on your behalf.
Your Action
- Obtain Town Planning approval before we can progress to a Building Permit, if this is required for your block. Your consultant will advise if this applies to you.
07
Step 7 · Pre-Construction
Before Construction
We’re almost on site. Final drawings are completed, materials are ordered, and your site supervisor is allocated.
Xircon Action
- Confirm all necessary approvals are received.
- Complete final construction drawings and present them to you for sign-off.
- Place orders for materials with our suppliers.
- Prepare your client file for site start and allocate your dedicated site supervisor.
Your Action
- Provide proof of land ownership or your confirmed settlement date.
- Prepare your site for start. Your client liaison officer will provide specific requirements.
- Provide an up-to-date Site Compaction Report.
- Confirm unconditional loan approval and provide loan documentation. If you're using our finance partners, this is not required. If you're self-funding, Xircon Homes requires your final progress payment of 10% to be paid two weeks prior to site start and held in trust.
- Sign your final construction drawings before commencement.
- Review HIA Contract Section C before site start.
08
Step 8 · Construction
Base Stage
Great news! You’ve now reached the official starting point of the construction process on your new Xircon Home. Now it’s time to bring your vision from paper to real life.
Xircon Action
- Your base supervisor will make an introductory call.
- Site excavation occurs where required. Under-slab drains are laid and the concrete slab is poured.
- A qualified building surveyor completes a slab inspection.
Your Action
- Complete your first progress payment. You’ll need to authorise the progress payment and forward it to your lending institution.
09
Step 9 . Construction
Frame Stage
This is where the brickwork, roof tiles, external doors and windows are fixed in place. Note: only wiring, piping and ducting will be installed for the completion of the rough. Fit offs of these items will be completed in the practical completion stage.
Xircon Action
- Construct the frames and install the roof trusses.
- Conduct an inspection of the frame by a qualified building surveyor.
- If necessary, our construction supervisor will arrange a site meeting with you.
Your Action
- Complete your second payment. You’ll need to authorise the progress payment and forward it to your lending institution.
10
Step 9 . Construction
Lock Up Stage
This is where the brickwork, roof tiles, external doors and windows are fixed in place. Note: only wiring, piping and ducting will be installed for the completion of the rough. Fit offs of these items will be completed in the practical completion stage.
Xircon Action
- Complete brickwork, roof cover, and rough installation of electrical, security, ducted vacuum, heating and cooling, and plumbing. Note: only wiring, piping, and ducting are installed at this stage. Fit-offs are completed at practical completion.
- A qualified building surveyor inspects on completion.
- Your construction supervisor will arrange an onsite meeting if required.
Your Action
- Complete your fourth progress payment. You’ll need to authorise the progress payment and forward it to your lending institution.
11
Step 9 . Construction
Fixing Stage
The inside of your home takes shape. Plaster linings go in, kitchen and vanity cabinetry are installed, and stairs are fitted.
Xircon Action
- Install plaster linings, kitchen and vanities (excluding stone benchtops at this stage), and stairs.
- A qualified building surveyor inspects on completion.
- Your construction supervisor will arrange an onsite meeting if required.
Your Action
- Complete your fourth progress payment. You’ll need to authorise the progress payment and forward it to your lending institution.
12
Step 9 . Construction
Practical Completion
It’s nearly there. This is the final construction stage, the one where your home really comes to life.
Xircon Action
- Complete painting, floor lining, and all electrical and plumbing fit-offs. Install heating, ducted vacuum systems, stone benchtops, shower screens, mirrors, splashbacks, door furniture, and rails.
- A qualified building surveyor completes a final inspection.
- Your construction supervisor arranges an onsite meeting.
- Our quality assurance team conducts a final inspection of your completed home.
- Settlement generally takes place seven to 14 days after your new home presentation.
- Your client liaison officer will forward your Certificate of Occupancy once available.
Your Action
- Forward your Certificate of Occupancy to your financial institution to release the final payment, if applicable.
12
Step 9 . Construction
Settlement Moving In
Congratulations! Your beautiful new home is now complete and is ready for you to move in and enjoy. Settlement generally takes place between seven and 14 days after your new home presentation.
Xircon Action
- On the day of settlement, our construction supervisor will conduct an onsite handover.
- Appliances are installed at an agreed time after settlement has taken place.
- You will come to our Head Office to collect your home’s keys from our Client Liaison Executive.
Your Action
- Complete your fifth and final progress in our office on the day of settlement.
- This amount includes the last stage payment and any unpaid variations.
- Once paid, you will receive your house keys and settlement pack.
13
Step 9 . Construction
Warranty Inspection
Three months after settlement, our qualified warranty inspector will contact you to arrange a formal inspection of your home.
Xircon Action
- Our qualified warranty inspector will contact you to arrange a Warranty Inspection, three months after settlement.
Your Action
- Confirm an appointment to meet with the Warranty Inspector at your new Xircon home.
14
Step 9 . Construction
Agreed Works
We will arrange any subsequent works identified during the Warranty Inspection that require rectification or touch-ups.
Xircon Action
- On inspection day, all agreed works are documented and copies provided to you.
- Suppliers and sub-contractors for the agreed subsequent works will contact you to book in time for works to be completed.
Your Action
- Review inspection list of warranty works and to receive a copy for their own records.
- Confirm booking with suppliers and sub-contractors.
15
Step 9 . Construction
Completion of Works
All agreed rectification works are carried out and confirmed in writing.
Xircon Action
- Once all works have been confirmed as complete by our respective suppliers and sub-contractors, one of our representatives will be in touch with you
- Confirm in writing (letter/email) stating all agreed subsequent works have been completed.
Your Action
- Confirm all agreed subsequent works have been completed as per the warranty inspection list.
Frequently Asked Questions
Pre-construction — covering design, tender, selections, and approvals — typically takes three to four months. Once we’re on site, construction through to handover generally takes six to nine months. Your total build journey from first appointment to keys is usually nine to 12 months, depending on your home’s size, your block, and approval timelines.
No. Once you sign your HIA building contract, no further changes or variations are permitted. This is why Steps 3 and 4 — tender and colour selections — are so important. Take the time you need at those appointments to get everything right before you sign.
Site costs cover the work needed to prepare your block for construction — things like cut and fill, retaining walls, and service connections. Many builders provide an estimate that can blow out significantly once work begins. Xircon provides fixed site costs in your tender, so you know exactly what you’re paying before you commit. Our rock removal assurance also caps rock removal at a flat $1,500 fee regardless of how much rock is found.
Under Xircon’s rock removal assurance, you pay a flat $1,500 — no matter how much rock is removed. You won’t face an unexpected cost blowout if your site turns out to be more challenging than the initial survey suggested.
After settlement, Xircon conducts a formal Warranty Inspection three months in. Any agreed rectification items are then scheduled and completed by our suppliers and subcontractors. The 12-month period gives you peace of mind that minor issues arising after you move in are taken care of.
Our 30-year structural guarantee covers the structural integrity of your home. Full details are on our Structural Guarantee page.
Not necessarily. While Xircon doesn’t sell land directly, we work closely with developers across Melbourne’s growth corridors and can help connect you with available lots in areas you’re considering. Talk to our team about what’s available in your preferred suburb.